T6373BC1130 Original Honeywell Mechanical air conditioning thermostat for fan coil unit
Specification
MT01 series of thermostats are usually used on the commercial, industrial and civil constructi ons, which can control the fan coil of air-conditioning, water valve and wind valveect. It can make the temperature balance in the setting range in the location, and all switches are manual switch. Very simple to manipulate.
Characteristics
Dialing button for setting the temperature: The place the finger points to is the current temperature value.
ON/OFF Switch for System: Press ON/OFF Key to turn on/off of the thermostat.
Working Mode Switch: Press HEATCOOL key to switch the heating/Cooling mode.
Fan Speed Key: L-M-H, that is, Low speed-Moddle speed-High speed, Wind valve controller does not have this function.
Functions
Model Name |
Function Explanation |
Objects controlled |
MT01A |
2 tubes fan coil controller,can be set up to control the fan coil |
3 gears of fan coil,2 and 3 wire of motorized valve,magnetic valve on/off wind valve,3 wires of wind valve |
MT01B |
4 tubes fan coil controller,can be set up to control the fan coil |
3 gears of fan coil,2 and 3 wire of motorized valve,magnetic valve on/off wind valve,3 wires of wind valve |
Technique Parameters
Temperature controlling range |
10°C~30°C |
Working voltage |
230VAC±10%,50/60Hz |
Current load |
< 3A(resistant load) |
Sensing element |
box with the gas |
Temperature differential |
≤ 1°C(at the 25°C) |
Storing environment temperature |
-20~55°C,relative humidity:RH<92% |
Surface material |
ABS engineering plastic,manual switch is off-white,the rest is ivory-white |
Exiernal dimension |
85*130*40mm(W*H*D) |
Installation |
standard 86 installing box |
Product photo
FAQ:
1. Where is your company?
we are located in Guangzhou, the capital city of Guangdong Province, near to Shenzhen, Foshan & Hong Kong, very convenient for shipping.
2. How about the MOQ?
1 unit is ok.
3. Shipping methods and lead time?
By Express: 5-7 working days to your door (DHL, UPS, TNT, FedEx...).
By Air: 7-10 working days to your airport.
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference.
Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days).
4. What is the term of Payment?
T/T, L/C,Western Union, Paypal;
30% T/T in advance,70% before delivery.
5. What are your main products?
Compressor;
Refrigeration gas;
Refrigeration spare parts ;
Cold room panels and equipments .
6. Packaging & Shipping:
Packing: wooden pallet, wooden case or with outer carton, or as per customers' specific requirements.