Original 1.5m R410A 0086 0053 Testo Refrigerant Charging Hose for Testo 549/Testo 550/Testo 557 Manifold Gauge

Product Details
Customization: Available
Length of Hose: 150cm
Use: Refrigeration Spare Part
Still deciding? Get samples of $ !
Request Sample
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (14)
  • Original 1.5m R410A 0086 0053 Testo Refrigerant Charging Hose for Testo 549/Testo 550/Testo 557 Manifold Gauge
  • Original 1.5m R410A 0086 0053 Testo Refrigerant Charging Hose for Testo 549/Testo 550/Testo 557 Manifold Gauge
Find Similar Products

Basic Info.

Model NO.
0086 0053
Refrigerant
R410A, R134A, R22
Size
1/4"SAE
Use for
Testo 549/Testo 550/Testo 557 Manifold Gauge
Working Pressure
Working Pressure 800psi, Burst 4000psi.
Transport Package
Color Box
Specification
50 pcs/ctn
Trademark
Testo
Origin
China
HS Code
9030339000
Production Capacity
100000PCS/Year

Product Description

Original 1.5m R410A 0086 0053 Testo Refrigerant Charging hose For Testo 549/Testo 550/Testo 557 Manifold gauge
 

Features

Testo Refrigerant Charging hose 

(1) Brand:Testo

(2)Model number:0086 0053

(3)Quantity: 3 pieces (red,yellow,blue)

(4)Length:1.5m

(5)All the hoses with 1/4"SAE

(6)Working pressure 800PSI, Burst 4000PSI.

(7) Use for Testo 549/Testo 550/Testo 557

Product photo

Original 1.5m R410A 0086 0053 Testo Refrigerant Charging Hose for Testo 549/Testo 550/Testo 557 Manifold Gauge
Original 1.5m R410A 0086 0053 Testo Refrigerant Charging Hose for Testo 549/Testo 550/Testo 557 Manifold Gauge

Original 1.5m R410A 0086 0053 Testo Refrigerant Charging Hose for Testo 549/Testo 550/Testo 557 Manifold Gauge

FAQ

1.   Where is your company?

we are located in Guangzhou, the capital city of Guangdong Province, near to Shenzhen, Foshan & Hong Kong, very convenient for shipping.

2.  How about the MOQ?

1 unit is ok.

3.  Shipping methods and lead time?

By Express: 5-7 working days to your door (DHL, UPS, TNT, FedEx...).

By Air: 7-10 working days to your airport.

By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference.Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days).
 

4.  What is the term of Payment?

T/T, L/C,Western Union, Paypal;  

30% T/T in advance,70% before delivery.
 

5.  What are your main products?

Compressor;

Refrigeration gas;

Refrigeration spare parts ;

Cold room panels and equipments .
 

6.  Packaging & Shipping:

Packing: wooden pallet, wooden case or with outer carton, or as per customers' specific requirements.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier