• Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A
  • Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A
  • Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A

Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A

Media: Gas
Temperature: High Temperature
Material: Copper
Connection Form: Flange
Pressure: High Temperature
Function: Can Tap Valve
Samples:
US$ 5/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2017

Suppliers with verified business licenses

Guangdong, China
to see all verified strength labels (13)

Basic Info.

Model NO.
HS-338/HS-339
Standard
DIN
Application
Industrial Usage, Water Industrial Usage, Household Usage, Refrigerator Parts, Freezer Parts, Air Condition
Product Name
Can Tap Valve
Model Number
HS-338/HS-339
Size
1/4 SAE
Refeigerant
R134A
Package
250 PCS/CTN
Transport Package
250PCS/Bag
Specification
HS-339
Trademark
HongSen
Origin
China
HS Code
8481300000
Production Capacity
10000PCS/Year

Product Description

Good quality HongSen brand HS-338/HS-339 Can Tap Valve For R22/R134A


Product Description
 
Model Connection Application
HS-338 1/4 SAE R12
HS-339 1/4 SAE R134a
HS-340 1/4 SAE R12,R22,R134A,R404A,R401A,R407C
HS-341A  1/4SAEx5/16FSAE  R410A,R32

Picture of product

Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A
Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A







Good Quality Hongsen Brand HS-338/HS-339 Refrigerant Can Tap Valve for R22/R134A


FAQ

1.   Where is your company?

we are located in Guangzhou, the capital city of Guangdong Province, near to Shenzhen, Foshan & Hong Kong, very convenient for shipping.
 

2.  How about the MOQ?

1 unit is ok.


3.  Shipping methods and lead time?

By Express: 5-7 working days to your door (DHL, UPS, TNT, FedEx...).

By Air: 7-10 working days to your airport.

By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference.

Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days).

 

4.  What is the term of Payment?

T/T, L/C,Western Union, Paypal;  

30% T/T in advance,70% before delivery.

 

5.  What are your main products?

Compressor;

Refrigeration gas;

Refrigeration spare parts ;

Cold room panels and equipments .

 

6.  Packaging & Shipping:

Packing: wooden pallet, wooden case or with outer carton, or as per customers' specific requirements.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2017

Suppliers with verified business licenses

Trading Company
Number of Employees
4
Year of Establishment
2016-08-09