Customization: | Available |
---|---|
Brand: | Testo |
Customized: | Non-Customized |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Extremely high sensitivity of 3g/a enables detection of even the smallest leaks
Visual and acoustic alarm for optimum leakage detection
Permanent sensor check, ensuring that your work is both safe and fast
Earplug connection for safe leakage detection in loud environments
Everything you need for professional leakage detection: the testo 316-4 set 1 with leak detector for all common refrigerants CFC, HFC, HCFC and H2, including refrigerant sensor head, case, mains unit and earphones. You will therefore be ideally equipped to carry out quick, reliable leakage detection.
Delivery Scope
testo 316-4 leak detector including refrigerant sensor head, case, mains unit and earphones.
Specifiaction
General technical data | |
---|---|
Operating humidity |
20 to 80 %RH |
Reaction time |
< 1 s |
Dimensions |
190 x 57 x 42 mm |
Operating temperature |
-20 to +50 °C |
Product colour |
Black |
Length of gooseneck |
370 mm |
Start-up time |
<50 sec (0 ... +50 °C); <80 sec (-20 ... 0 °C) |
Detectable |
R134a; R22; R404A; H2 and all common refrigerants such as CFC, HCFC, HFC NH3 (separate sensor head) |
Sensitivity |
3 g/a |
Leakage alarm |
optical and audible alarm |
Standards |
EN 14624:2012 |
Alarm function |
Optical; audible |
Battery type |
1 battery block (6 cells NiMh) |
Battery life |
6 h (Continuous operation) |
Storage temperature |
-25 to +70 °C |
Weight |
348 g |
1. Where is your company?
we are located in Guangzhou, the capital city of Guangdong Province, near to Shenzhen, Foshan & Hong Kong, very convenient for shipping.
2. How about the MOQ?
1 unit is ok.
3. Shipping methods and lead time?
By Express: 5-7 working days to your door (DHL, UPS, TNT, FedEx...).
By Air: 7-10 working days to your airport.
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference.Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days).
4. What is the term of Payment?
T/T, L/C,Western Union, Paypal;
30% T/T in advance,70% before delivery.
5. What are your main products?
Compressor;
Refrigeration gas;
Refrigeration spare parts ;
Cold room panels and equipments .
6. Packaging & Shipping:
Packing: wooden pallet, wooden case or with outer carton, or as per customers' specific requirements.